Step 2a: Mounting NavQPlus

First chose option A or B

Option A: Dual Lock mounting the NavQPlus on the metal frame

Apply dual lock to bottom of the NavQPlus
Apply mating dual lock and stick to the top plate in the correct position shown here.

Option B: Mounting the NavQPlus on the metal frame

Alternative mounting using screws

The kit includes DUAL LOCK type mounting, eliminating the need for the procedure below and screw fastening. This will also elevate the NAVQPLUS boards slightly so that Ethernet and USB will have better clearance. We strongly recommend you just use some DUAL LOCK Velcro instead of screwing the NavQPlus to the metal frame.

An alternative method of mounting is to use the provided M3 screws to securely attach the board's corners to the following position in the metal frame:

Screw them in from the bottom side. It should look like this:

Then wire the cables: NavQPlus Cable management on top plate

Use a ziptie to secure the power cable (4 wire cable with 5 pin JST-GH), and route the CAN cables down and underneath as shown below.

Zip tie the NavQPlus power cable

After successfully attaching the NavQPlus, the next step is to install the MR-CANHUBK344 evaluation board.

Last updated

Was this helpful?