Checklist for shipping pre-assembled training units

This checklist is primarly for units prepared to be assembled and shipped for trainings

This checklist is prepared for training units that will be shipped elsewhere This is a checklist for use if you have already assembled a unit and need to ship it to another location. It is to ensure the recipient has all the components needed, and the kit will be functional.

See the photos of these items lower in this page

Short checklist for shipping

Changes before shipment

Critical support components that must be in box


Photos and videos of the checklist items

Checklist items before shipping

Ensure rotating battery connector holder is free rotating


Changes to make before shipment


Ensure these critical items are included

Put them in a single bag.


REMOVE the following components if present

Last updated